In November, we completed the first elevator at Marathon Oil as a mock up before we start the rest of the 35 cabs mid-December.  It was a kick off for the project. This is the biggest project we have done in Houston in a single building. The rear walls are composed of Arabescato Cervaiole Marble. The side walls are matte back painted low iron mirror by Goldray. The handrail is a Forms+Surfaces 1 1/4″ diameter satin stainless steel handrail with returned ends and Compass Series “Clamshell” standoffs. The ceiling is #4 brushed stainless steel with Axis Lighting BEAM2 LED recessed mounted fixtures with Acolyte LED perimeter strip lights. They look amazing! Stay tuned for the completion of the other cabs!

Marathon Oil Rear Wall

Marathon Oil Rear Wall

Marathon Oil Side Wall

Marathon Oil Side Wall

 

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *