A beautiful day in Houston to talk Travertine with Schindler Houston! We even brought a taco truck with us!

Asad Hashmi, KONE Houston

Submit your photos to your Regional Territory Manager today!

Look what we found at Oklahoma Memorial Stadium!

Submit your photos to your Regional Territory Manager today!

John Black, Schindler Las Vegas
Submit your photos to your Regional Territory Manager today!

Project: Fairmont Princess located in Scottsdale, Arizona

Rafael Albarran, Carlos Navarro, and Roberto Sandoval hold up a completed leather frame. This stunning frame will be framing a mirror on the rear elevator wall in the upcoming Fairmont Princess project!

 

Fairmont Shop pic

With the 50th anniversary of Caesars Palace Las Vegas quickly approaching, Caesars decided to revamp their “Roman Tower” with a $75 million remodel into the “Julius Tower.” Julius Tower, named aptly after Julius Caesar, underwent a total transformation from top to bottom. The elevators were no exception and Travertine manufactured and installed the elevator interiors that complement the new design scheme. Julius Tower 2 G Julius Tower 6 G Julius Tower 3 G

Our construction is over and the Dallas Engineering office looks amazing. It was a true team collaboration between our engineering department and our Dallas management. Travertine’s investment in their employees is unparalleled!2-1 After 2-2 After 2-5 After

In November, we completed the first elevator at Marathon Oil as a mock up before we start the rest of the 35 cabs mid-December.  It was a kick off for the project. This is the biggest project we have done in Houston in a single building. The rear walls are composed of Arabescato Cervaiole Marble. The side walls are matte back painted low iron mirror by Goldray. The handrail is a Forms+Surfaces 1 1/4″ diameter satin stainless steel handrail with returned ends and Compass Series “Clamshell” standoffs. The ceiling is #4 brushed stainless steel with Axis Lighting BEAM2 LED recessed mounted fixtures with Acolyte LED perimeter strip lights. They look amazing! Stay tuned for the completion of the other cabs!

Marathon Oil Rear Wall

Marathon Oil Rear Wall

Marathon Oil Side Wall

Marathon Oil Side Wall

 

 

Charles Schwab in Denver, Colorado was recently completed.  This look was achieved with lower panels of Trespa Virtuon “Graphite Grey”  and upper panels of fire rated particle board substrate faced and wrapped (horizontal edges) with #4 brushed stainless steel with middle panels of Pulp Studio “Pintura” back painted glass (Color: White 06). The handrail is 1-1/2″ diameter #4 brushed stainless steel.Charles Schwab Denver (1)Charles Schwab Denver (3) Charles Schwab Denver (5)

With our state of the art water jet and press brake, Travertine now has endless possibilities to customize your elevator cab! From swing returns, vents and graphics, any dxf file can be cut into a variety of materials. Stone, glass, metal, wood, the choices are endless!

IMG_2787 IMG_2791 IMG_5866